Physical entry/exit points and Annual Average Gross Calorific Value
Technical - commercial information related to the physical entry/exit points from the N.T.S.
Access to National Transmission SystemScope The Regulation on access to the National Natural Gas Transmission System, hereinafter referred to as the regulation, sets the conditions for applicants` / users` access to NTS (National Transmission System). For the purposes of this regulation, access to the NTS consists of: capacity booking and connection to the NTS. Access to the NTS does not involve the obligation of the NTS operator to provide a source of gas for the applicants / users. Szeged - Arad pipelineInformation regarding the network users from Romania on the long term capacity booking for Szeged - Arad interconnection pipeline
SNTGN TRANSGAZ SA Medias informs all those interested that on October 14th, 2010 was held at Csanádpalota, in Hungary, the official inauguration of Szeged-Arad interconnection pipeline in the presence of Mr. Guenther Oettinger, EU Energy Commissioner. Attached documents: NTS InfrastructureN.T.S. Infrastructure (Status: JANUARY 2023) Structure of gas mixture
TendersThe acquisition activity is performed under further amended and supplemented Emergency Ordinance no. 34, dated April 19th, 2006, on the awarding of public acquisition contracts, works concession contracts and service concession contracts.
|