Pilot project for the early implementation of CAM-NC

General terms and conditions of the gas transmission contracts concluded as a result of the auctions for the allocation of bundled capacity at the Csanádpalota interconnection point and the tariffs for the monthly bundled capacity:

RBP Contractual documents:

Presentations of the RBP Network Users Infoday carried out under the Pilot Project for the early implementation of Regulation (EU) No. 984/2013 establishing a Network Code on Capacity Allocation Mechanism in Gas Transmission Systems and supplementing Regulation (EC) No. 715/2009 of the European Parliament and of the Council (CAM-NC):

1. General information on CAM NC (FGSZ)
2. A. Network access in Hungary (FGSZ)
2. B. Network access in Romania (Transgaz)
3. A. Licensing and tarification (MEKH)
3. B. Licensing and tarification (ANRE)
4. Introduction of the Regional Booking Platform (FGSZ)
5. Terms and conditions of accessing RBP (FGSZ)
6. Further capacity auctions (Transgaz)