Framework gas transmission contract, the terms and conditions of the monthly/daily gas transmission contracts, concluded as a result of the auctions for the firm and interruptible capacity booking in the Ruse – Giurgiu interconnection point, the tariffs for the offered capacity products:
Framework natural gas transmission contract, the terms and conditions of the annual/quarterly/monthly/daily gas transmission contracts, concluded as a result of the auctions for the firm and interruptible capacity booking in the entry / exit points of the Isaccea 1 – Negru Vodă 1 pipeline, the tariffs for the offered capacity products:
Transactions to buy gas for technological consumption | |||||
Transmission tariffs for 2016 - 2017GAS TRANSMISSION TARIFFS VALID FOR THE GAS YEAR 2016 - 2017 The gas transmission tariffs as approved by Order no. 39/10.08.2016 of the Romanian Energy Regulatory Authority, published in the Romanian Official Journal nr. 617/11.08.2016, Part I, are as follows: The capacity booking tariffs by entry/exit point/group of points related to firm/interruptible gas transmission services provided by means of the National Gas Transmission System lei/MWh/h: EIC Codes
EIC codes Reference Manual – issued by ENTSO-E Guide for the Applicants for EIC Codes EIC codes Requesting Forms : Capacity booking in the IP Csanadpalota (CAM NC)Framework gas transmission contract, the terms and conditions of the annual/quarterly/monthly/daily gas transmission contracts, concluded as a result of the auctions for the firm and interruptible capacity booking in the Csanádpalota interconnection point, the tariffs for the offered capacity products: |